Schematics complete for Red Deer Regional Hospital expansion, says Infrastructure Minister
While stopping in Red Deer City Hall on Monday, Minister of Infrastructure Pete Guthrie confirmed the schematics stage for the Red Deer Regional Hospital expansion is complete.
While visiting various new buildings like the Recovery Centre and the Child Advocacy Centre, the minister spoke with city council during their regular meeting.
According to the Royal Architectural Institute of Canada, the schematic design will take the client’s requirements during pre-design, and put them into physical architectural form. Aspects include descriptions of structural, mechanical, and electrical systems, and the space required for these systems like vertical shafts, construction costs, and scheduling for design and construction.
Guthrie said these designs, created by Dialog Design, have been given to the Ministry of Health and a public engagement session is looking to be scheduled for March 2024.